HeERO_D6.4-eCall Guidelines_v1.1

Uploaded on:
2014-12-10 09:47:14.0
File Size:
2.57 MB
Dimensions:
595 x 842 pixels
233 views 3 downloads
Title: HeERO_D6.4-eCall Guidelines_v1.1
Description: HeERO project deliverable
Keywords: HeERO, project, deliverable, eCall,
Size: 2.57 MB; 595 x 842 pixels; 50 x 71 mm (print at 300 DPI); 157 x 223 mm (screen at 96 DPI); 116 layers;
Categories: Documents, ITS Deployment  
    • ID: 10288
    • HeERO_D2 1_Functional and operational requirements_v1 0
    • ID: 10293
    • HeERO_WP2_D2.5_Manual_for_operator's_training_with_Annexes_v2.05_Final
    • ID: 10294
    • HeERO_WP2_D2 4_System_test_cases_and_verification_report_v1 1
    • ID: 10296
    • HeERO_WP2_D2 6_Final_system_test_cases_v1 03
    • ID: 10297
    • HeERO_WP2_DEL_D2.1_SoA analyse operational and functional requirements_v2.0
    • ID: 10298
    • HeERO_WP2_DEL_D2.2_Functional_specification_v1.0
    • ID: 10299
    • HeERO_WP2_DEL_D2.3_HW_SW_implementation_v1.0
    • ID: 10300
    • HeERO_WP2_DEL_D2.4_System_test_cases_and_verification_report_v1.0_Final
    • ID: 10301
    • HeERO_WP3_D3.2_Preliminary Operational Results_ver2.3_Final
    • ID: 10303
    • HeERO_WP3_DEL_D3.1-Pilot operation preparation report_V1.22 ANNEX(3)
    • ID: 10304
    • HeERO_WP4_DEL_D4.3 Intermediate Results of the Tests_ver1.4
    • ID: 10305
    • HeERO_WP4_DEL_D4 1_20111007_v1 2_Final
    • ID: 10306
    • HeERO_WP4_DEL_D4 2 V1.3_Final
    • ID: 10307
    • HeERO_WP4_DEL_D4 4-results_1.1
    • ID: 10308
    • HeERO_WP4_DEL_D4 5-results_v1.0
    • ID: 10312
    • HeERO_WP5_DEL_D5 2-Project website_v1.1
    • ID: 10313
    • HeERO_WP5_DEL_D5 3-Project Flyer_2012
    • ID: 10314
    • HeERO_WP5_DEL_D5 6-HeERO-conference_v0.2
    • ID: 10315
    • HeERO_WP5_DEL5-4_compendium_v1.4
    • ID: 10316
    • HeERO_WP6_D6 1_eCall Deployment barriers and enablers preliminary report_V2.2 Final
    • ID: 10317
    • HeERO_WP6_D6 3_Needs for eCall certification_V1.0
    • ID: 10318
    • HeERO_WP6_DEL_D6 5-Recommendations on implementation and operation of eCall_v0 5
    • ID: 10302
    • HeERO_WP3_D3 3_Final Operational Results_v2.2_FINAL_comp
    • ID: 10310
    • HeERO_WP5_DEL_D5.5.eCall Newsletter Year 2_v3.0
    • ID: 10295
    • HeERO_WP2_D2 6_Final_system_test_cases_ANNEX_B (2)
    • ID: 10289
    • HeERO_D6.1b_V1.5_final
    • ID: 10292
    • HeERO_Newsletter_issue3_FINAL
    • ID: 10311
    • HeERO_WP5_DEL_D5 1-Comm Plan and Strategy_v1.5
    • ID: 10309
    • HeERO_WP5_DEL_D5.5_Newsletter_Issue_1_v3
    • ID: 10319
    • HeERO1&2_Flyer_v6
    • ID: 10290
    • HeERO_D6.2_Deployment_enablers_and_opportunities_and_challenges_v.0.8